INTRODUCTION
Rockmax Supercote 3 is two components solvent free epoxy coating. Its design for medium chemical and mechanical resistance. When cured it formed Good texture finished, seamless and gloss.
AREA OF USES
ADVANTAGES
APPLICATION AND INSTALLATION
PREPARATION
Concrete must be sound, clean and free from cement paste, dust, dirt and any other contaminants. Concrete must be at least 28 days and minimum Compressive strength 25N/mm2 and minimum tensile strength (pull off) at 1.5 N/mm2. The concrete moisture content must less than 4%.
PRIMING
Apply Rockmax Supercote P prior to apply body coat. For steel structure, please contact Rockmax for further information.
MIXING
Mix part A and part B approximate 3 minutes until homogeneous using electric mixer (400-500 rpm).
APPLICATION
Apply by brush or roller on the prepared surface. Wait until dry 24 hours prior to apply second coat.
CURING
Protect applied area from foot traffic at approximate 24 hours and fully cure in 7 days.
CLEANING
Clean all tools and equipments immediately with acetone, xylene, thinner or solvent.
PACKAGING
20 kg set